ZZ1V MIVAN formwork system Available On Rent

 Mivan is a quality aluminum structure developed  This innovative form of work is actually suitable for constructing houses in large quantities at a rapid pace. The speed of construction needs to be given greater importance, especially for large housing projects or township projects. In order to respond to these unusual challenges in terms of time, cost and quality, the construction industry has come up with a smart method of construction known as the “MIVAN formwork system”.


Mivan technology has been used widely in Europe, Asia, Gulf Countries, and other parts of the globe. It is suitable for constructing a large number of houses in a short period of time using room size forms to construct walls and slabs in one constant pour on concrete.


Advantages:


Mivan Formwork requires relatively less labor

Faster completion of floors

Lesser number of joints and reduced leakages

Smooth finishing of wall and slab

Low maintenance

More seismic resistance

Huge carpet area

Good quality construction work

Faster completion

No need for plastering

 

Area of use


Mivan technology is preferred for constructing a large number of houses in a limited period of time without any hassles. This technology also makes use of room size structures to construct slabs and walls. It permits shuttering for both slabs and columns in construction. Walls of huge room size, as well as floor slabs, are done right through this kind of Mivan shuttering.

The key uses of Mivan shuttering

Easy to operate within less time

Includes the 3S scheme of construction to give strength, safety, and speed

Slabs and walls are easily formed in one consistent development

Assembling and fitting the part of shuttering

Beam construction and column are removed

Construction of slabs and walls in a simultaneous way

 

The major features of Mivan Formwork:


Load Carrying Capacity

Striking Time

Durability

Cycle Time


Construction techniques of Mivan Formwork


Assembling The Wall Reinforcing Steel:


This is used to give structure to the building and hold the concrete until they gain 50% of the required strength. The aluminum formwork is set around the factory-made steel mesh which is instantly built on the construction site.


Placement Of Aluminium Formwork:


Along with the wall strengthening steel, room-sized walls and structured floor slabs are built. The aluminum metal slabs are very easy to handle and are also very accurately made. The pin and spearhead system is used to combine these structures, and these can be instantly destroyed once the concrete structure is ready.


Pouring Of Concrete:


After the forms are shaped, high-quality concrete is poured into the structure. The cast is later removed to make way for a hard-concrete structure backed by wall strengthening steel. .




+919024909286

+918233373376




TAKE QUOTATION FIRST


QUOTATION IS Chargeable 




MPK BANK 

42522283754     FOR TRADE ( MINIMUM THRESHOLD APPLY)


State Bank of India 


IFSC CODE

SBIN0031213



PANCARD

BVIPN4554J 



GST

08BVIPN4554J2Z3



AICTE CODE

15EIUCE240



SWIFT CODE

SBININBBJ12



SBI SAVING

51102744457



IFSC CODE

SBIN0031213